Transmission Main From Six Miles To Downtown Substantially Completed
The National Water Commission (NWC) has substantially completed the transmission main from Six Miles to downtown Kingston, which is one of the major transmission mains serving Kingston and St. Andrew, at cost of more than $3.4 billion. The entity also rehabilitated the five-million-gallon Treated Water Storage Reservoir at Constant Spring. This was noted by Minister without Portfolio in the Ministry...
                    
                
                
                
                        
                        
                        
                        
                
                
                



